MTH601(Operations Research ) Grand Quiz solution Fall 2020
Today we will talk about the MTH601 Quiz solution. If you have any doubts about the answer or if you know any answer, you can -You can - tell us in our comment section۔ Let's read and solved Quiz MTH601solution fall 2020.
MTH601 Quiz With Solution
So Start Quiz MTH601 Grand Quiz Solution Part 1
Q1 to
Q1: The drawback of the Graphical method to solve an LP is that the problem of---------can not be handled by this.
- Higher Dimension(n>2)
- low dimension(n<3)
- duality
- degeneracy
- Art
- Science
- Engineering
- Technology
- ECO of Purchasing model without Shortage.ct
- ECO of manufactnring model without Shortage.
- ECO of Purchasing model with allowed Shortage.
- invariant
- Dummy
- Critical
- non-Critical
- non of the above
- Maximizing its profit only
- Minimizing its cost only
- Both masimizing its profit and minimizing its cost
- Change the businees strategy and looking forward new customers.
- Variance the project lenght
- Standard Deviation of project lenght
- Probability of completion
- Expected time of complection
duration of the comptete project are 50 and 45 days respectively then which of the following will be the standard normal variable of the project?
- -7.7677
- -0.625
- 0.625
- 1.7677
- Right to left
- left to right
- Top to Bottom
- Bottom to top
- Withdraw of items from inventory at constant rate in per unit of time
- the inventory is assembled at constant rate per unit of time
- Setup Cost
- Carrying Cost
- item Cost
- Demand
- The Holding Cost will increase
- The Holding Cost will Decrease
- The Setup Cost will increase
- The Setup Cost will Decrease
- non-Critical activites
- dummy activites
- head or tail activites
- critical activites
- Satisfy all the Constraints
- does not satisfy all the constraints
- Satisfy least one of the constraints
- does not satisfy least one of the constraints
- Q/t
- Q/2
- (Q/2)t
- 2Q
- item Cost
- Set-up Cost
- inventory holding Cost
- Shortage Cost