MTH601(Operations Research ) Grand Quiz solution Fall 2020

 Today we will talk about the MTH601 Quiz solution. If you have any doubts about the answer or if you know any answer, you can -You can - tell us in our comment section۔ Let's read and solved Quiz MTH601solution fall 2020. 

MTH601 Quiz With Solution

So Start Quiz MTH601 Grand Quiz Solution Part 1 

Q1 to

Q1: The drawback of the Graphical method to solve an LP is that the problem of---------can not be handled by this.

  • Higher Dimension(n>2)
  • low dimension(n<3)
  • duality
  • degeneracy
Q2:Modeling of a linear programming problem from a real-life world is a/an--------

  • Art
  • Science
  • Engineering
  • Technology
Q3:By putting the replacement rate R?infinity in the Economic order Quantity(EOQ)of manufacturing model with allowed shortage then the result is--------
  • ECO of Purchasing model without Shortage.ct 
  • ECO of manufactnring model without Shortage.
  • ECO of Purchasing model with allowed Shortage.
  • invariant
Q4:if an activity has nan-zero value of total float such that it can be further delayed to the length of slack without delaying the project then it is said to be-----------
  • Dummy
  • Critical 
  • non-Critical
  • non of the above
Q5:For an industrialist optimization means--------
  • Maximizing its profit only
  • Minimizing its cost only
  • Both masimizing its profit and minimizing its cost
  • Change the businees strategy and looking forward new customers.
Q6:While solving a network flow problem by using PERT the area under the normal distribution curve gives----------
  • Variance the project lenght
  • Standard Deviation of project lenght
  • Probability of completion
  • Expected time of complection
Q7:for a development project if its standard deviation of project lenght = 8 expected and scheduled
duration of the comptete project are 50 and 45 days respectively then which of the following will be the standard normal variable of the project?
  • -7.7677
  • -0.625
  • 0.625
  • 1.7677
Q8:While finding the Critical in the phase of late start and late finish we start from last node and the computations are performed from------- up to the beginning event
  • Right to left
  • left to right
  • Top to Bottom
  • Bottom to top
Q9:A single cycle consists of two phases in case of Manufacturing without shortage then which of the following is the first phase?
  • Withdraw of items from inventory at constant rate in per unit of time
  • the inventory is assembled at constant rate per unit of time
Q10:which of the following quantity will vary in case of dynamic order quantity model?
  • Setup Cost
  • Carrying Cost
  • item Cost
  • Demand
Q11:if the purchases are made in large quantities then the Economic Order Quanti ty model may fail because----------
  • The Holding Cost will increase
  • The Holding Cost will Decrease
  • The Setup Cost will increase
  • The Setup Cost will Decrease
Q11:When we have to manage a project with available resources we have the option of resource leveling here the resources availability is less than the maximum resources required for an activity then it is feasible to divert the resources to---------
  • non-Critical activites
  • dummy activites 
  • head or tail activites
  • critical activites
Q12:Non-feasible soulution----------- associated with a given linear programming problem
  • Satisfy all the Constraints
  • does not satisfy all the constraints
  • Satisfy least one of the constraints
  • does not satisfy least one of the constraints
Q13:if the total inventory in one cycle of t units of itmes is(1/2)Qt then which of the average ineventory at any time?
  • Q/t
  • Q/2
  • (Q/2)t
  • 2Q
Q14:if an item is manufactured then the direct or indirect material labor and overhead expenses are referred to -------
  • item Cost
  • Set-up Cost
  • inventory holding Cost
  • Shortage Cost


You may like these posts

  1. To insert a code use <i rel="pre">code_here</i>
  2. To insert a quote use <b rel="quote">your_qoute</b>
  3. To insert a picture use <i rel="image">url_image_here</i>
Please Don't enter any spam link In the comment box.