-->

CS605 (Software Engineering ii ) Grand Quiz solution Fall 2020

pdf cs605, cs605 quiz mega file, vu cs605, cs605 midterm solved papers by moaaz, cs605 ppt slides, cs605 final term solved papers by moaaz, cs605 gdb

 Today we will talk about the CS605 Quiz solution. If you have any doubts about the answer or if you know any answer, you can -You can - tell us in our comment section۔ Let's read and solved Quiz CS 605 solution fall 2020.

CS 605 Quiz with solution 

So Start Quiz CS 605 Grand Quiz Solution  Part  1

Q1 to 

Q1: The size of software can be measured by using-----------

  • No. of Items
  • No. of classes 
  • functional Points
  • No. of methods
Q2:give you a better insight into the slate of the process or product
  •  Exceptions
  •  Metrics
  •  Errors
  •  Threats
Q3:model is developed keeping in mind the element of risk in the development of software
  • Spiral
  • RAD
  • incremental
  • synchronize and Stabilize      
Q4: if we plot a graph between defects reported and defects fixed then:
  • The difference between defects reported and fixed will show the defects yet to be fixed
  • This graph will show that the defect detection process is not accurate
  • This graph will show that some requirements are ambiguous
  • we can not draw any information from that graph
Q5: The extent to which a program can be reused in other applications is called
  • Reliability
  • Performance
  • Usability
  • Reusability
Q6:SEI Stands for
  • Software Engineering institute
  • Software Electric institute
  • Software Electronics institute
  • System Engineering institute
Q7:is the ability to encourage people to create and feel creative
  • Organization
  • Motivation
  • Innovation
  • Managerial identity
Q8:Technique was initially developed for manufacturing processes in the 1920s waiter Stewart
  • Upper Control Line
  • Control Chart
  • CMP
  • Quality
Q9:Control Charts are of the following two types
  • Moving range control charts and individual control charts
  • Moving range control charts stable control charts
  • individual control charts and Stable control charts
  • independent control charts and stable control charts
Q10:Files and the logical files that the customer understands and must be maintained by the system
  • Raw 
  • External 
  • Logical
  • Internal
Q11:----------- is for providing mechanisms for objective variation of any activity
  • Metrics
  • Measurement
  • Indicators
  • Pointers
Q12:MOI model of leadership was developed by-----------------
  • Weinberg
  • Newton 
  • Don Carlos
  • Edison
Q13:Vision phase in a software process focuses on-----------------
  • What 
  • Why
  • How
  • Change
Q14:The--------dimension in the rational unified process model represents the dynamic aspect of the process
  • Horizontal
  • Angular
  • Vertical
  • Regular
Q15:in controlled centralized communication between leader and the members is -------
  • Horizontal
  • Linear
  • Vertical
  • Circular
Q16:in measuring software process Quality by using control charts, if the gap between the defects reported and defects fixed is increasing. then it means`
  • The product is in an unstable condition
  • The product is ready for shipment
  • The product is in stable condition
  • None of the above
Q17:Every project has a defined number of staff members. As time allocation occurs. the project manager must ensure that no more than the allocated number of-------- have been scheduled at any given time.
  • Task
  • People
  • Days
  • Components
Q18:Software Project management primarily deals with metrics related to productivity and---------
  • Quality
  • Efficiency
  • Reliability
  • Compatibility

You may like these posts

  1. To insert a code use <i rel="pre">code_here</i>
  2. To insert a quote use <b rel="quote">your_qoute</b>
  3. To insert a picture use <i rel="image">url_image_here</i>
Please Don't enter any spam link In the comment box.