Cs 605 Assignment 3 Solution fall 2020/2021
In this video, we will see the solution failure of CS 605 assignment number three 2019 in which you will be whitewashed on the regular solution file and if you have any opinion regarding the assignment, please let us know in the comment section. Let's start the assignment CS 605.
CS 605 Assignment 03 Question Part 1
- The assignment is submitted after due date.
- Did not follow the answer sheet guidelines.
- The submitted assignment does not open or file is corrupted.
- Your assignment is copied from internet, handouts or from any other student (Strict disciplinary action will be taken in any of these cases).
- Your assignment must be in .doc format.(Any other formats like scan images, PDF, Zip, rar, bmp, docxetc will not be accepted).
- No assignment will be accepted through email.
- You will learn different concepts relevant to software engineering.
Question 1 |
|
Name/Terms
- Feasibility of the project
- Task Set
- Adaptation Criteria
- Total Float
- Timeline Chart
- Earned Value Analysis
- Defect Removal Efficiency (DRE)
- Error Tracking
- Time Boxing
- SQA Group
- Walkthroughs
- Formal Technical Reviews
- Quality Control
- Statistical Software Quality Assurance
Soultion CS 605 :
Name / Terms |
Descriptions |
6 |
Helps
to quantitatively measure the progress and performance of a project as the
project team goes through the tasks scheduled for them. |
2 |
To
decide which Software process will be most suited for a project with the help
of a function having different project characteristics. |
1 |
To
assure the progress of the project each task is assigned with a limit and
when it is reached the work stops on the current task even if it is still in
progress. |
5 |
It
provides an optical representation of start and finish dates of a project,
what tasks are to be performed, who will perform a specific task, linkage and
overlapping between tasks and the duration of each task within a project. |
14 |
It
helps the project managers in certain situations to make wise decisions so
that the progressing project may not lead to a crisis in terms of schedule
and budget at the end of a project. |
3 |
While
deciding it we need to be sensible and must utilize our previous experiences
along with the results we get through from adaptation criteria and task set
selector functions. |
11 |
Firstly,
categorize the collected information about defects then try to uncover its
root cause and work on to fix what you have traced earlier. |
9 |
A schedule adaptability measure to make
sure if a specific task is unable to be completed within the required
deadlines should not negatively impact the subsequent tasks and the overall
completion date of the project. |
7 |
To check
about the required changes and usefulness of the intended software by getting
a feedback from different users and customers. |
8 |
To
assess the software product’s current state of progress for defects within
the design or implementation of the product. |
13 |
To
check if the degree of quality of the product is improved while errors are
reduced and is Performed before the deployment of the software product. |
4 |
It
is decided whether to accept the product without requiring any changes or may
completely reject the developed software due to blunders made during its
construction. |
1 |
A
measure of the ability of the
developers to get rid of defects from the software before they are reported
by the users after its deployment. |
10 |
A
review for quality assurance where the developer/author guides the
development team members to go through the project and raise queries about
any possible issues, its alternate solutions or standard violations. |
8 |
We
use it firstly to recognize the problems in requirements, design and source
code etc. and then look for its solution to normalize them. |
12 |
To verify if the intended software is meeting its required requirements or not and to make sure that it is developed according to its specified standards. |